Project info

  • Construction, Environment Designs
  • Luxor Drinking Water and Sanitation Company.

  • Currently being executed.

  • Al-Dababia Village - Luxor.

  • 45,153,000.00 EGP

Project overview

  • The sudden increase in foreign currency exchange rates against the Egyptian Pound, resulting in a more than double increase in the prices of imported items for the project.
  • The unpreparedness of some locations for work, such as the entrance to the treatment plant, which requires shaping the slope over a distance of 450 meters.
  • The irregular topography of the site and variations in elevations, with slopes reaching up to 4 meters within a distance of no more than 50 meters.

Challenge

 Nin iis qui facit eorum claritatem. Investigationes demonstraverunt lectores legere me lius quod ii legunt saepius. Claritas est etiam processus dynamicus, qui sequitur mutationem consuetudium lectorum.

Result

  • The entire line has been implemented except for 450 meters.
  • Ten chambers have been completed, with five remaining, and work is ongoing on two of them.
  • The original project duration has expired, and the project has been extended for an additional 3 months, ending on 7/3/2024.