Project overview
- The sudden increase in foreign currency exchange rates against the Egyptian Pound, resulting in a more than double increase in the prices of imported items for the project.
- The unpreparedness of some locations for work, such as the entrance to the treatment plant, which requires shaping the slope over a distance of 450 meters.
- The irregular topography of the site and variations in elevations, with slopes reaching up to 4 meters within a distance of no more than 50 meters.